UK edition
Independent hospitality journalism
Search & archive
Beyond the headlines.
Into the business.
The Journal
Hotels & travel

Whitbread’s 371-room London plan starts with two very different buildings

Whitbread says both hub by Premier Inn schemes have won planning backing. One puts 204 rooms inside a former office. The other makes room for 167 by building upwards.

A hotel can sell the same room in two different buildings. Getting that room into both buildings is another matter.

At Victory House on Kingsway, Whitbread plans 204 bedrooms in a former office building of around 45,000 sq ft. The stone façade stays largely as it is. Behind it, the proposed hotel has to work within the existing floorplates. At Churchill House on Red Lion Square, the former home of the Royal College of Anaesthetists, Whitbread is keeping much of the building but adding floors for some of the 167 bedrooms. The addresses are a short walk apart. The construction jobs are quite different.

The stone frontage of Victory House on Kingsway, London
Victory House, Kingsway. Photo: Whitbread.

Whitbread operates 16 hub hotels in central London and says it has a further 2,000 hub rooms in its secured pipeline there. These two schemes account for 371 planned bedrooms, not rooms anyone can book. Whitbread says Camden’s planning committee backed Churchill House on 19 November, while the Victory House decision was delegated to council officers. The committee papers for Churchill House recommend permission subject to a Section 106 agreement. Camden’s public planning data did not show a formal decision date for either scheme when we checked on 20 November.

The small bedroom is what makes the comparison interesting. Take a hotel with bigger rooms and the existing office floor can run out of exterior wall before it runs out of square footage. Make the rooms smaller and more may fit, but a room still needs a way to the corridor, somewhere for the plumbing to go and, where the design calls for it, a window. The same compact room that helps make a retained floor work at Kingsway doesn’t remove the need to build extra floors at Red Lion Square.

There is a temptation to reduce this to a story about affordable rooms in expensive postcodes. For the operator, I think the more useful question is what it has to spend to get each of those rooms open. If the existing floors take the layout with relatively little alteration, the operator can make use of much of a building it has already bought. If there are floors to rebuild or add, the extra bedrooms have to justify that work. Whitbread hasn’t published conversion costs for either site, so the room counts alone don’t tell us which will turn out to be the better deal.

The first hub opened in 2014 in a converted building on St Martin’s Lane. What Whitbread is repeating here is a room format and a location strategy, not a single way of delivering a hotel. That’s the lesson worth taking beyond these two addresses: before comparing the room count, ask how much of the building had to change to produce it.

Sources

Share this article

LinkedInFacebookXWhatsAppEmail

Keep the conversation going.

Have a view that adds to this story? Write to Michael.

Join the daily brief